Hyperdesmo D-2K

HYPERDESMO® D-2K

Two-component, solvent-free liquid membrane based on pure hydrophobic polyurethane resins

Hyperdesmo D-2K
HYPERDESMO® -D-2K  is a two-component, solvent-free liquid membrane based on pure hydrophobic polyurethane resins with the addition of inorganic fillers, to which the product owes its excellent resistance to friction and chemicals. The membrane bonds as a result of a reaction with moisture contained in the atmosphere. The membrane shows excellent adhesion to almost any type of substrate. The membrane has medium elasticity and increased resistance to chemicals.
 

APPLICATION


  • Waterproofing and protection of surfaces such as:
    • Industrial floors,
    • Concrete parking structures,
    • Stadium stands,
    • Chemical tanks,
    • Sewage treatment tanks,
    • Septic tanks.

FEATURES AND BENEFITS


  • Two-component, solvent-free polyurethane membrane – safe for use in enclosed spaces.
  • Medium flexibility – adapted to surfaces exposed to intensive use.
  • Very high resistance to friction and chemicals – thanks to the content of inorganic fillers.
  • Strong bond to a variety of surfaces – excellent adhesion to concrete, ceramics, asphalt, wood and galvanized steel.
  • Excellent thermal resistance – operating temperature range:
    • Permanent exposure: up to 90°C ,
    • Thermal shock: up to 200°C .
  • Resistance to low temperatures – remains flexible even at -40°C .
  • Environmentally neutral after hardening – can be used in drinking water tanks.

CONSUMPTION


  • Minimum total consumption: 0.6-1.0 kg/m² .

PACKAGING


  • 13 kg (10 kg component A + 3 kg component B) ,
  • 3.9 kg (3 kg component A + 0.9 kg component B) .

CERTIFICATION


  • ISO 9001/14001 & OHSAS 18001 .

HYPERDESMO SYSTEM application guide

APPLICATION


  • Preparation of the substrate:
    • Clean the surface with a high pressure washer,
    • Remove greasy substances, cement laitance and loose fragments of old coatings,
    • Fill the gaps with appropriate products ( HYPERSEAL ®-25LM ).
  • Priming:
    • Use appropriate primer.
  • Mixing:
    • Pour component A into the container with component B and mix with a low-speed mixer ( 300 rpm ).
    • Working time after mixing: 20 minutes (at 25°C & 55% RH).
  • Application:
    • Application method: roller, rubber squeegee, notched trowel.
    • Wear:
      • 0.3-0.5 kg/m² per layer ,
      • Minimum total: 0.6-1.0 kg/m² .
    • Time to apply the next coat: 6-24 hours (do not exceed 48 hours).
Waterproofing and protection:
  • chemical tanks
  • cesspools
  • sewage treatment tanks
  • industrial floors
  • car parks
  • stadium stands